Trench Struts and Prop Jacks for concrete
Trench Struts and Prop Jacks is frequently used in formwork and construction to support the floors, ceilings, bridges and beams. With its high load-bearing capacity, it is popular on temporary supports during building repair or alteration work. The advantages are easy to use and time-effective to install, also lower cost.
In construction, steel props is used as vertical support in scaffolding as below situation, such as: removing walls, making holes, temporary support for ceiling, beams and so on.
1. Product Information
Trench Struts and Prop Jacks for concrete
1. Adjustable Length: 1.8m-3.2m, 2.2m-4.0m, 3.0-5.5m, 2.0m-3.5m
2. Raw material: Q235/Q255/Q345
3. Type: Light duty/Medium duty/Heavy duty Steel prop
4. Inspection: by ourselves or by SGS or B.V or others
5. Delivery time: within 20 days after confirming the order
2. Production Process
3. Packing and Loading
All props are packed in bundles with 50/60 pieces per bundle.
4. What we can do?
Quality is the priority especially in construction safety. Our factory has more than 15 years experience in steel pipes and scaffolding products. We have our own pipe factory, galvanization factory and scaffolding factory, which help us control the quality from tube material, tube sizes, prop welding and packing. All for the better quality and safety construction.
Trench Struts and Prop Jacks for concrete
Trench Struts and Prop Jacks is frequently used in formwork and construction to support the floors, ceilings, bridges and beams. With its high load-bearing capacity, it is popular on temporary supports during building repair or alteration work. The advantages are easy to use and time-effective to install, also lower cost.
In construction, steel props is used as vertical support in scaffolding as below situation, such as: removing walls, making holes, temporary support for ceiling, beams and so on.
1. Product Information
Trench Struts and Prop Jacks for concrete
1. Adjustable Length: 1.8m-3.2m, 2.2m-4.0m, 3.0-5.5m, 2.0m-3.5m
2. Raw material: Q235/Q255/Q345
3. Type: Light duty/Medium duty/Heavy duty Steel prop
4. Inspection: by ourselves or by SGS or B.V or others
5. Delivery time: within 20 days after confirming the order
2. Production Process
3. Packing and Loading
All props are packed in bundles with 50/60 pieces per bundle.
4. What we can do?
Quality is the priority especially in construction safety. Our factory has more than 15 years experience in steel pipes and scaffolding products. We have our own pipe factory, galvanization factory and scaffolding factory, which help us control the quality from tube material, tube sizes, prop welding and packing. All for the better quality and safety construction.
content is empty!