Scaffold couplers are the fundamental component that is used together with scaffold tubs. The scaffolding tubes are joined together by steel clamps and couplers, and the scaffolding tubes work as the standards, braces and ties for workers to do the construction work in height.
There are various types of clamps and couplers. Japanese, British, and German type clamps. Based on different producing process, the fittings are included into pressed and drop forged couplers. For British couplers, the common standard is EN74 and BS1139. The surface treatment is Electro galvanized, hot dipped galvanized and painted, while the electro galvanized is the better choice because of the beautiful surface and lower cost.
1. Product Information
EN74 Fixed Couplers and Clamps for Scaffold Tubes
Name: Fixed couplers/ Double couplers
Size: 48.3*48.3mm
Type: EN74 droped forged couplers
Weight: 0.97kg/pc
Surface: Electro galvanized
Color: Silver
Packing: 25 piece/ plastic bag, with wooden pallet
MOQ: 5000pieces
Delivery date: within 20 days
Payment term: TT, LC or DP
2. Production Process
3. Packing and Loading
4. Our factory
Scaffold couplers are the fundamental component that is used together with scaffold tubs. The scaffolding tubes are joined together by steel clamps and couplers, and the scaffolding tubes work as the standards, braces and ties for workers to do the construction work in height.
There are various types of clamps and couplers. Japanese, British, and German type clamps. Based on different producing process, the fittings are included into pressed and drop forged couplers. For British couplers, the common standard is EN74 and BS1139. The surface treatment is Electro galvanized, hot dipped galvanized and painted, while the electro galvanized is the better choice because of the beautiful surface and lower cost.
1. Product Information
EN74 Fixed Couplers and Clamps for Scaffold Tubes
Name: Fixed couplers/ Double couplers
Size: 48.3*48.3mm
Type: EN74 droped forged couplers
Weight: 0.97kg/pc
Surface: Electro galvanized
Color: Silver
Packing: 25 piece/ plastic bag, with wooden pallet
MOQ: 5000pieces
Delivery date: within 20 days
Payment term: TT, LC or DP
2. Production Process
3. Packing and Loading
4. Our factory
content is empty!