Scaffold tube, also called scaffolding tube, is the main component of the scaffolding construction system. Scaffolding tube are widely used as a temporary structure to help workers craw and repair building in height. Also scaffolding tubes are frequently be used in formwork and shoring system.
The outside diameter is 48.3mm with thickness 3.2 or 4.0mm. There are different grade of scaffolding tube, such as S235, S355. Our factory has more than 15 years experience in Scaffolding tube, we can produce EN39, EN10219, BS1139 and JIS3444 standard tube. All are produced strictly according to the standard. Usually the surface is hot dipped galvanized with zinc coating above 210g/m2, which offers long term corrosion resistance.
1. Product Description
Scaffolding Steel Tubes building material
Size: 48.3*4.0mm
Length: 5"-21"
Surface: Hot dipped Galvanized
Standard: EN 39 scaffolding tube
Raw Material: S235GT
Test: SGS, CCIC and other 3rd party test
We can 100% promise the S235GT material complying to EN39 standard, and the flatten test passed as per the standard.
2. Production Process
3. Packing and Loading
Packing: 61 pieces/bundle. Hexagonal package with steel strips for solid unloading
4. Quality Control
Scaffold tube, also called scaffolding tube, is the main component of the scaffolding construction system. Scaffolding tube are widely used as a temporary structure to help workers craw and repair building in height. Also scaffolding tubes are frequently be used in formwork and shoring system.
The outside diameter is 48.3mm with thickness 3.2 or 4.0mm. There are different grade of scaffolding tube, such as S235, S355. Our factory has more than 15 years experience in Scaffolding tube, we can produce EN39, EN10219, BS1139 and JIS3444 standard tube. All are produced strictly according to the standard. Usually the surface is hot dipped galvanized with zinc coating above 210g/m2, which offers long term corrosion resistance.
1. Product Description
Scaffolding Steel Tubes building material
Size: 48.3*4.0mm
Length: 5"-21"
Surface: Hot dipped Galvanized
Standard: EN 39 scaffolding tube
Raw Material: S235GT
Test: SGS, CCIC and other 3rd party test
We can 100% promise the S235GT material complying to EN39 standard, and the flatten test passed as per the standard.
2. Production Process
3. Packing and Loading
Packing: 61 pieces/bundle. Hexagonal package with steel strips for solid unloading
4. Quality Control
content is empty!